ghostguild-org/docs/BACKLOG.md
Jennie Robinson Faber 33ba082b82
Some checks failed
Test / vitest (push) Successful in 11m7s
Test / playwright (push) Failing after 9m38s
Test / visual (push) Failing after 9m31s
Test / Notify on failure (push) Successful in 2s
docs: consolidate open issues into BACKLOG.md
Single source of truth for every open issue across the codebase. Pulls
from LAUNCH_READINESS.md (post-launch sections), TODO.md (deferred
features + simplify follow-ups + wave-Slack pilot), and a fresh sweep
of in-code TODO/FIXME comments.

LAUNCH_READINESS.md now keeps only the pre-cutover deploy checklist and
points to BACKLOG.md for everything else. Cutover note corrected — it
has not happened yet.

Force-added BACKLOG.md despite the /docs/ gitignore rule because
LAUNCH_READINESS.md is tracked and now references it.
2026-04-30 15:37:26 +01:00

8.5 KiB
Raw Blame History

Ghost Guild — Open Backlog

Last consolidated: 2026-04-30. Single source of truth for every open issue across the codebase. Pulls from LAUNCH_READINESS.md, TODO.md, the post-launch backlog memory, and a fresh sweep of in-code TODO/FIXME comments.

Cutover has not happened yet. Deploy steps live separately in LAUNCH_READINESS.md.


Pre-cutover (do once)

Operational steps that have to run during cutover. Full details + env-var list in LAUNCH_READINESS.md.

  • Provision the Dokploy app, set env vars (full list in LAUNCH_READINESS.md), confirm BASE_URL exact-matches the public origin and NODE_ENV=production.
  • Add the daily Dokploy Scheduled Task that POSTs to /api/internal/reconcile-payments with X-Reconcile-Token.
  • Run node scripts/migrate-contribution-amount.cjs --apply against prod Mongo BEFORE the new code serves traffic.
  • Set NUXT_HELCIM_MONTHLY_PLAN_ID=50302 and NUXT_HELCIM_ANNUAL_PLAN_ID=50303 in Dokploy.
  • Set NUXT_RECONCILE_TOKEN to a 32+ char random string.
  • Push local main to origin/main.
  • Deploy.
  • Run node scripts/reconcile-helcim-payments.mjs --apply against prod Mongo AFTER the new code serves traffic.
  • Audit prod for pre-fix series-pass bypass registrations (registrations on pass-only series children with registeredAt < 2026-04-20 from non-pass-holders). Decide per case.
  • In Helcim dashboard: disable the default payment-confirmation email for plans 50302 + 50303 (we send our own CRA-safe version via Resend).
  • Run one real test charge and verify (a) Payment doc in Mongo and (b) exactly one CRA-compliant confirmation email.
  • Rotate HELCIM_API_TOKEN in the Helcim merchant portal and update the Dokploy env var.
  • Trigger the daily reconcile task once manually in Dokploy to confirm it's wired correctly.

Pilot smoke walks (before first wave)

Once cutover lands, before the first Slack onboarding wave goes out:

  • Pilot smoke walk for Slack-invited workflow. One admin manually clicks "Mark as Slack invited" against a real test member in production, confirms the row updates in place, and confirms the dashboard "Slack coming" note disappears for that member. Unit tests cover the pieces; nothing covers the live admin-to-member round-trip.

Bylaws-decoupling (waiting on amendment ratification)

Membership status is being decoupled from payment status. Copy + UI gates already align; behavioral changes below remain.

  • B1. server/api/members/cancel-subscription.post.js:31,48 flips status to pending_payment on cancel. Under the new bylaws, cancellation should keep status active (just zero contribution). Update the findByIdAndUpdate payload + response, the comment at line 26, and add coverage in tests/server/api/cancel-subscription.test.js.
  • B3 cancelled. pending_payment stays.
  • B4 admin "Pending Payment" → "Payment setup incomplete" shipped 2026-04-29 (59d2be2).

Known gotchas (post-launch)

  • Admin edit does not sync Helcim recurringAmount. /admin/members/[id] PUT writes contributionAmount direct to Mongo by design. Admins must PATCH Helcim manually. The admin form already shows an --ember-bordered notice (commit e756170); a real sync flow is a future enhancement.
  • Cadence switch rejected on active subscriptions. server/api/members/update-contribution.post.js:206 refuses cadence changes mid-subscription with a TODO comment pointing here. No UI toggle exists on /member/account. Adding cadence switch requires a Helcim subscription replacement flow, not a plain update.
  • S2 test fixture id/slug mismatch (local dev only). Seeded S2 series has id: 'test-s2-drop-in-allowed' but slug: 'test-s2-drop-in-allowed-series'. Doesn't affect prod — fix the seed script if anyone re-runs fixtures.

Accessibility / a11y

  • Button minimum target size. Site-wide .btn renders ~35px tall. WCAG AA 2.5.8 (24×24) passes; AAA 2.5.5 (44×44) fails. Bumping padding affects every button — design call, not a drop-in fix. Flagged 2026-04-11.

Deferred features (own session each)

  • Email automation system. Patterned after Tranzac's implementation (separate project, already built). HTML email bodies with template management and drip sequences. Deferred 2026-04-20 — ruled wasted work given the larger system is designed elsewhere. Current transactional email lives in server/utils/resend.js + inline in server/api/auth/login.post.js, server/routes/oidc/interaction/login.post.ts, server/api/admin/{members,pre-registrants}/invite.post.js. Copy dump at docs/email-copy-dump.md. See memory: project_email_automation_future.
  • Receipts for event ticket purchases (Phase 2). Phase 1 receipts only cover membership payments. Event tickets — especially guest purchases without member accounts — need a receipt flow. Likely an emailed PDF/HTML receipt at purchase time. Build target: JuneOct 2026, live Jan 2027. See memory: project_receipts.
  • Series/event waitlist. Admin can configure tickets.waitlist.enabled and maxSize; server/utils/tickets.js returns waitlistAvailable: true when full; app/components/SeriesPassPurchase.vue:341 and EventTicketPurchase.vue have stub handleJoinWaitlist that toasts "Waitlist Coming Soon." No server endpoint, no confirmation email, no event_waitlisted activity hook. Either implement end-to-end or hide the button by removing the v-if="availability?.waitlistAvailable" branches in EventSeriesTicketCard.vue:175 and EventTicketCard.vue:73.
  • ASVS Phase 4. File-upload validation pipeline, granular RBAC, credential encryption.

Wave-Slack pilot follow-ups

  • E2E coverage for e2e/wave-slack-onboarding.spec.js. 16 scaffolded tests, all .skiped with TODOs. Filling them in needs fixture work the spec didn't scope. Test 7.8 (final copy match) and 6.9 (sortable column / "no Slack yet" filter) gated on Open Questions in the test plan. Defer until pilot wraps unless a regression surfaces.
  • Pilot exit decision (~8 weeks post-launch). Either restore server/_archive/utils/checkSlackJoins.js + its plugin if polling is needed, or delete the archive permanently. Driven by whether the manual-invite cadence is sustainable post-pilot.
  • slack_invite_failed enum slug cleanup. Detector and alert removed in d15458b, but the slug remains in server/models/adminAlertDismissal.js enum so historical dismissal rows continue to validate. Full removal needs a one-shot cleanup of stale dismissal rows in the DB. Roll into a future schema-tidy pass.

Simplify-pass follow-ups (still open)

Items surfaced during the 2026-04-29 /simplify review. The 2026-04-30 small-wins batch shipped 3 items (STATUS_LABELS dedup, ImageUpload focus, signupBridge rename). Remaining:

  • Extract .tint-candle / .tint-ember utility classes. The color-mix(in srgb, var(--candle) 15%, transparent) + matching border pattern is now inlined as style="" in ~9 sites across EventSeriesTicketCard.vue, SeriesPassPurchase.vue, NaturalDateInput.vue, ImageUpload.vue. Promote to utility classes in app/assets/css/main.css so future tints don't keep multiplying inline styles (and so :hover / :focus variants are reachable).
  • Audit member && truthy checks in sibling ticket/subscription routes. Commit f66455e fixed server/api/events/[id]/tickets/available.get.js:115 to use hasMemberAccess(member). Same anti-pattern likely exists in adjacent routes (tickets/purchase.post.js, subscription endpoints). Guests/suspended/cancelled members would currently look like full members for any feature gated on truthiness alone.

Optional / low-priority

  • Welcome-email Slack-timing mention. Currently the welcome email doesn't mention Slack timing — the dashboard carries that note. Could add a one-line "Slack invitation comes in monthly waves — there may be a short wait" if the dashboard turns out not to be enough signal.

  • project_post_launch_backlog.md — high-level digest of this file
  • project_launch_readiness.md — cutover status (NOT YET happened)
  • project_launch_flow_map.md — onboarding flow + Slack wave model
  • project_pre_registrants.md — invitation system + pre-reg lifecycle
  • project_helcim_plan_model.md — cadence-keyed plan model
  • project_contribution_amount_redesign.md — arbitrary $ amount + guidance presets
  • project_receipts.md — Phase 1 done, Phase 2 pending
  • project_email_automation_future.md — Tranzac reference for full system