ghostguild-org/.forgejo/workflows
Jennie Robinson Faber 84aea08a5f
All checks were successful
Test / vitest (push) Successful in 11m51s
Test / playwright (push) Successful in 16m24s
Test / Notify on failure (push) Has been skipped
chore(ci): drop visual regression suite
Visual snapshots were generated on macOS but CI runs on Linux, and
font hinting differences between the two would always produce false
positives. The job was already continue-on-error and the baselines
weren't giving trustworthy signal — remove the spec, baselines, CI
job, and now-unneeded snapshot config / --ignore-snapshots flag.
Functional e2e coverage in the playwright job is unaffected.
2026-05-01 13:37:06 +01:00
..
test.yml chore(ci): drop visual regression suite 2026-05-01 13:37:06 +01:00